JUDGEMENT
DHANANJAYA Y.CHANDRACHUD,J. -
(1.) The present Civil Appeal arises from an order dated 11 February 2019 of the Principal Bench of the National Green Tribunal[NGT]. In its order, the NGT held
that the increase in the total construction area of the appellants project was an
"expansion" under a notification (bearing number S.O. 1533) dated 14 September
2006[EIA Notification ] of the Ministry of Environment and Forests. The NGT found that the appellant had undertaken an "expansion" as set out in Paragraph 2 of the EIA Notification without complying with the regulatory procedure prescribed. The
appellant was directed to deposit an amount of Rupees one crore with the
Central Pollution Control Board[CPCB]. Noting that the construction at the project site
had been completed, the NGT appointed a five-member expert committee to
study the impact of the appellants expanded project and to suggest remedial
measures.
The facts
(2.) The appellant is the project proponent of a residential redevelopment, called ,,Oriana Residential Project situated at CTS no 646, 646 (Pt) Gandhinagar,
Bandra (East), Mumbai 400050. On 8 June 2010 the appellant received a
Commencement Certificate to carry out the development and erect a building
situated at the project property. The appellant began construction. When the
construction commenced, the total construction area was 8,720.32 square
metres. The ambit of the project was expanded, and the constructed area was
increased to 32,395.17 square metres. Under the EIA Notification, an
Environmental Clearance[EC] was necessary if the total construction area exceeded
20,000 square metres. Hence, the appellant applied for an EC under the EIA Notification.
(3.) The fourth respondent, the State Level Expert Appraisal Committee for Maharashtra[SEAC] recommended the grant of an EC for the project. On 2 May 2013 the third respondent, the State Level Environment Impact Assessment Authority
for Maharashtra[SEIAA], based on the recommendations of the SEAC granted an EC. It
is not in dispute that at the time when the EC dated 2 May 2013 was granted, the
total construction area of the project was 32,395.17 square metres. The grant of
the EC was conditional on the appellant obtaining a ,,consent for establishment
from the Maharashtra Pollution Control Board under the Air (Prevention and
Control of Pollution) Act 1981 and the Water (Prevention and Control of Pollution)
Act 1974.;