EXECUTIVE ENGINEER LVP DIVISION, WARDHA Vs. MAROTI BAPURAO AUCHAT
LAWS(SC)-2012-10-8
SUPREME COURT OF INDIA
Decided on October 04,2012

EXECUTIVE ENGINEER LVP DIVISION, WARDHA Appellant
VERSUS
MAROTI BAPURAO AUCHAT Respondents

JUDGEMENT

- (1.) Leave granted.
(2.) The first respondent herein filed Regular Civil Suit No.109 of 1995 praying for the grant of permanent injunction against the appellant Executive Engineer, Lower Vanna Project Division No.1, Wardha and also for a direction to restore the land to him. It was alleged that the defendants had undertaken the construction of the canal of Lower Vanna Project through the middle portion of the plaintiff's field, consequently a mandatory injunction was sought for to restore the land prior to the commencement of constructing the canal. The plaintiff alleged that the same was done to favour a nearby land owner so that his land could be saved. The suit was decreed and the defendants took up the matter in appeal which was dismissed and the matter was carried to the High Court. The High Court also dismissed the appeal on merits. The High Court in his order stated as follows: "I have carefully perused the documents produced by the appellant before the first appellate court. The submission made on behalf of the respondent No.1 that these documents do not disclose that the Government proposed to construct the canal through the middle portion of the field of respondent No.1 is acceptable and correct. Both the Courts have considered the original plan/map which was received from the custody of the appellants before the trial court to hold that the appellants had not proceeded with the construction work of the canal as per the original map. The Courts have further considered the other voluminous evidence on record to hold that the plaintiff was entitled to the grant of permanent and mandatory injunction as sought for. As already mentioned hereinabove, the documents placed by the appellants before the first appellate court merely relate to the acquisition of 0.7R of land belonging to the plaintiff/respondent No.1 but, none of the documents show the location through which the canal was to be constructed as per the original map."
(3.) The High Court also found no substantial question of law arose for consideration, in our view rightly. The matter came up for hearing before this Court. This Court passed an order on 9.10.2009 which reads as follows: "Petitioner's counsel seeks four weeks' time to produce: 1) the plan showing the original sanctioned alignment; 2) the plan showing the actual alignment; 3) the plan superimposing the actual alignment over the sanctioned alignment to highlight the difference; 4) the photographs of the land; 5) the extent of bifurcated land on either side of canal in survey No.174; 6) the protective measures proposed by petitioner to ensure that the unacquired portion of the land can be made cultivable by avoiding seepage. It is open to the petitioner to directly make an offer of Rs.5 lakhs as compensation in lieu of dismantling and fresh construction of canal without prejudice.";


Click here to view full judgement.
Copyright © Regent Computronics Pvt.Ltd.